Tasks : Selecting

Selecting
Before a Task can be managed and configured it must be selected.
To select a Task, perform the following actions:
1.
Open the Tasks tab (Fig. 20).
2.
In the Tasks list (Fig. 7) click in any column of the Task that needs to be selected.
Following selection, the entire row associated with the Task turns blue and the name of the Task appears on the title bar and to the right of the tab buttons.
NOTE:
If an attempt is made to select another Task and configuration changes have not been saved for the currently selected Task, a Save Changes dialog (Fig. 16) appears.