Tasks : Adding

Adding
To add a Task, perform the following actions:
1.
Open the Tasks tab (Fig. 20).
2.
A new row, highlighted in blue, is added to the bottom of the Tasks list (Fig. 7) or as the first row if no other Tasks are present.
The following information now needs to be defined before the Task can be saved:
Release time (required when combining mail pieces)